Protocol

How Noderr is built: architecture, vaults, trading, reputation, governance, treasury and security.

Testnet. Noderr runs on Base Sepolia. See Testnet Status.

Sections

  • Architecture: self-sovereign design, the node network and how capital flows.
  • Vaults: the six vaults, their target bands, fees and deposit options.
  • Autonomous Trading System: the ATE, the Floor Engine and the strategy pipeline.
  • Third party contributors: the planned framework for outside strategy developers.
  • TrustFingerprint: the onchain reputation score and how to improve it.
  • Governance: who controls the contracts today, the planned two-chamber DAO and the proposal lifecycle.
  • Treasury: how protocol funds are held and spent.
  • Security: the security model, audits and incident response.
  • Smart contracts: contract reference, addresses and how to interact onchain.

Performance targets

These are design targets and baselines, not production measurements. The network is not operating at scale, and the live validator count is currently 0. Baseline and target are the same value in every row.

AreaMetricTarget
NodeBlock validation time< 100ms
NodeTransaction throughput> 1,000 tx/s
NodeNetwork latency< 100ms
NodeMemory usage< 4GB
NodeCPU utilization< 50%
NodeDisk I/O< 100MB/s
NodeNetwork bandwidth< 100Mbps
ProtocolYield generationVault target bands, see the vault table. Not earning on testnet.
ProtocolCapital efficiency> 90%
ProtocolGas optimization< 100k gas
ProtocolConsensus finality< 10 sec
ProtocolValidator uptime> 99.9%
ProtocolNetwork security> 100 validators
APIAPI response time< 100ms
APIAPI throughput> 10,000 req/s
APIAPI error rate< 0.1%
APIAPI availability> 99.99%
APIGraphQL performance< 50ms
APIWebSocket latency< 100ms
Smart contractDeployment gas< 2M gas
Smart contractFunction gas< 100k gas
Smart contractStorage efficiency< 10k slots
Smart contractUpgrade cost< 500k gas

A third-party smart contract audit is scheduled for Q2 2027 and is not complete. No audit result, such as "0 critical findings", exists yet. See Audit Reports.

Next

results matching ""
    No results matching ""